June 2026

  • Locker cavities are getting framed in and electrical rough ins are nearing completion.

  • North Gym Bleachers have been completely demolished and a fresh coat of paint and graphics has been applied.


May 2026

  • Choir Room is completed and Faculty and Students can begin to move furniture back into the space.

  • Demolition in the corridors is ongoing with the removal of all the lockers.


April 2026

  • Media Center is complete and faculty and students are utilizing the space for testing.

  • Choir Room Ceilings are getting installed and walls have been painted. Finishes are ongoing with installation of flooring to follow.


March 2026

  • Stud framing is complete for the Choir Room. Drywall is being hung with first coat of paint to follow.

  • Media Center is wrapping up, and specialty items are being installed Ie. Markerboards, TVs, Signage, and Graphics.

  • Slab-on-grad


February 2026

  • Drywall finishings is completed in the Media Center, and 1st coat of paint has been applied.

  • Choir Room Slab has been poured, and MEP trades are installing their boxes.

  • Slab-on-grad


January 2026

  • MEP Rough-ins are complete in the Media Center, and CMU walls are built in the Choir Room.

  • Slab-on-grad


December 2025

  • Demolition is complete for Choir Room, and stud framing in the Media Center is in progress.

  • Slab-on-grad


November 2025

  • Demolition in progress in the Media Center and Choir Room!

  • Slab-on-grad