June 2026
Locker cavities are getting framed in and electrical rough ins are nearing completion.
North Gym Bleachers have been completely demolished and a fresh coat of paint and graphics has been applied.
May 2026
Choir Room is completed and Faculty and Students can begin to move furniture back into the space.
Demolition in the corridors is ongoing with the removal of all the lockers.
April 2026
Media Center is complete and faculty and students are utilizing the space for testing.
Choir Room Ceilings are getting installed and walls have been painted. Finishes are ongoing with installation of flooring to follow.
March 2026
Stud framing is complete for the Choir Room. Drywall is being hung with first coat of paint to follow.
Media Center is wrapping up, and specialty items are being installed Ie. Markerboards, TVs, Signage, and Graphics.
Slab-on-grad
February 2026
Drywall finishings is completed in the Media Center, and 1st coat of paint has been applied.
Choir Room Slab has been poured, and MEP trades are installing their boxes.
Slab-on-grad
January 2026
MEP Rough-ins are complete in the Media Center, and CMU walls are built in the Choir Room.
Slab-on-grad
December 2025
Demolition is complete for Choir Room, and stud framing in the Media Center is in progress.
Slab-on-grad
November 2025
Demolition in progress in the Media Center and Choir Room!
Slab-on-grad